我准备装修一下房子,具体要求如下:
1. Main Floor
(a) Replace floor.
(b) Replace Dish washer.
(c) Replace Sink and Faucet.
2. Stairs to the second floor
(a) Replace the carpet
3. Second Floor
(a) Caulking around the bath tub.
(b) Replace the tap
(c) Replace vinyl tile
(d) Replace (repair) toilet shutoff valve
4. Basement
(a) Replace the vinyl tile
包工包料,希望8月份能完成.
有愿意承包公司,可发悄悄话联系.
1. Main Floor
(a) Replace floor.
(b) Replace Dish washer.
(c) Replace Sink and Faucet.
2. Stairs to the second floor
(a) Replace the carpet
3. Second Floor
(a) Caulking around the bath tub.
(b) Replace the tap
(c) Replace vinyl tile
(d) Replace (repair) toilet shutoff valve
4. Basement
(a) Replace the vinyl tile
包工包料,希望8月份能完成.
有愿意承包公司,可发悄悄话联系.