听新闻,到机场路上的一座行人桥(还不走车)按原计划晚3年了,现又停了,又出问题了,又换人,这蜗牛都不如啊,6.9个米,

lilidoo

资深人士
VIP
注册
2003-06-05
消息
4,644
荣誉分数
432
声望点数
243
刚听俩耳朵新闻。

一座只走行人和自行车的个桥。
第一次好像混凝土有问题,推到重来,这次好像设计又有问题需要检查了,停工了。
在这么个拥挤的路上修了几年了,应该2011完成,现在估计不知啥时完了
还有这个减速的牌子从不挪开,不管上班不上班,节日不节日。


俩字: 服了
 
好不容易揽到一个建筑项目,不多建几次不亏了?
 
100万的项目80万就做完是SB.
100万的项目100万做完是2B.
100万的项目200万做完是小白.
100万的项目搞到600万做完,靠!你就是最成功的项目经理....
.
.
.
.
.
.
.
.
.
.我说的是乙方,当甲方的倒着看....
 
100万的项目80万就做完是SB.
100万的项目100万做完是2B.
100万的项目200万做完是小白.
100万的项目搞到600万做完,靠!你就是最成功的项目经理....
.
.
.
.
.
.
.
.
.
.我说的是乙方,当甲方的倒着看....

您太有才了,这仨回帖咋都这聪明
 
就是去huntclub拐出去之前的那座吧,修了可有时候了
 
就是去huntclub拐出去之前的那座吧,修了可有时候了
嗯....我还以为是要走汽车的呢.......就一过街天桥...6.9M....笑死人了....河南的路修得比河北好..:tx:
 
嗯....我还以为是要走汽车的呢.......就一过街天桥...6.9M....笑死人了....河南的路修得比河北好..:tx:

过街天桥,翻得到位。
就那德行,我还以为离机场近,是一机翼造型(可机翼矗天上也不是啥好事啊),原来是村了的logo ? 咋看咋不像。
 
upload_2013-10-4_22-34-27.png
 
Airport Parkway pedestrian bridge project suspended
New team of engineers to determine best way forward, deputy city manager says
CBC News Posted: Oct 04, 2013 3:29 PM ET

Construction of the Airport Parkway pedestrian and cycling bridge is being temporarily suspended, a city manager announced Friday.

The suspension will allow of a new team of engineers to determine how best to move forward with the project, said Nancy Schepers, the city's deputy manager of planning and infrastructure, at a technical briefing at City Hall.

This summer, professional engineers raised concerns about the bridge's stay supporting system and steel anchorage piece at the top of the tower. The city hired an independent bridge engineering firm to investigate the concerns and come up with recommendations.

The city then asked the design consultant, Genivar, to make design modifications.

"Following unproductive discussions with Genivar, the city lost confidence with them and their services were terminated," said a memo from Schepers to city council.

Delcan Corporation was hired by the city "to modify and assume full responsibility for the bridge design," the memo said.

Delcan's review should take until mid-November to complete and construction is suspended until the results are in.

There is no plan to cancel the project.

City plans legal action
The city plans to sue to recover costs "including but not limited to" any delays, claims, design review changes and construction modifications, the memo said.

The Friday briefing was chaired by Coun. Maria McRae, who earlier this week called for a third-party review into the long-delayed bridge.

The towering structure off Cahill Drive West north of Hunt Club Road was begun in 2011, but problems with the concrete used meant significant portions had to be dismantled and rebuilt.

"It's gone on long enough," McRae said on Tuesday. "The delay is significant, I share the disappointment of the community, I share the bewilderment of the community."

"I cannot make sense of this project why it's not done yet," she said.

The review will look at both internal and external factors, including the contractor, Louis W. Bray Construction Limited, said McRae.

The last time the city commissioned such a review was after the sink hole that swallowed a car and driver in Orleans. The same contractor, Louis Bray, was cleaning out a storm drain pipe under Hwy. 174 in 2012 when it collapsed later that day.
 
过街天桥,翻得到位。
就那德行,我还以为离机场近,是一机翼造型(可机翼矗天上也不是啥好事啊),原来是村了的logo ? 咋看咋不像。
搬家之前上班天天路过那里,也以为是一个什么欢迎来到渥太华的标志。离开己经二年多了,还要重修!资本主义还这样下去,不灭亡是天理不容啊!
 