河南大桥明年见了

  • 主题发起人 主题发起人 PAL
  • 开始时间 开始时间

PAL

资深人士
注册
2002-08-18
消息
1,800
荣誉分数
355
声望点数
243
:(又推迟了一年,这回说明年9月完工了。
 
就那么长个桥,进度真慢啊。

还有机场路那个过街桥,半路返工。丢人哦。
 
习惯了就好了,反正按时交货的到成了不正常了。
 
按合同每推迟一天市府得对造桥公司罚款5千,这一年多就是近200万。那公司罚得起吗?
想想也是大笑话。
 
20年前的中国:

南浦大桥由上海市市政工程设计院设计,黄浦江大桥建设指挥部组织施工。工程于1988年12月15日动工,1991年12月1日建成通车,工程实际决算8.15亿元人民币。该桥全长8629米,主桥846米,浦东引桥长3746米,浦西引桥长3754米。

Strandherd-Armstrong Bridge

The idea for a bridge in this location was first brought up in 1993 as a road bridge. The location was later revisited as the location for a light rail crossing for the O-Train, but that extension plan was cancelled. In 2010, the city, provincial, and national governments invested equal amounts totaling $48 million in building the bridge. The original contractor hired, ConCreate USL, went into receivership about 60% of the way complete with the project, and the City of Ottawa hired a new contractor, Horseshoe Hill Construction Inc., to finish the remainder of the project。

The project is expected to be completed in August 2013. The bridge is being assembled on the eastern shore of the Rideau River, and it is scheduled to be moved into place in the winter of 2012–13.
 
Which bridge? Alymer-Kanata??
 
看到这句话,我笑了。:p:D

是河东河西的事儿。

你整天捂着个嘴,不是笑难道是哭?:flaming:
 
现在有些明白了,为啥那个桥要建那么久。因为是钢结构的,分几十块,在东部造好了,要最后焊接上。焊接出问题了。
 
Armstrong-Strandherd Bridge
 