奇怪了,现在 417 上 过 Carling 那块还是有车啊?+ 换桥面实况

旧桥面没了,新桥面起运

cfc77_9.jpg
 
明天上午通车。牛!
以前也有过这样的YouTube。
 
eastbound 已经通车。
 
看来这儿还是有按时完成的工程;)
 
westbound 也快好了

cfc79_1.PNG
 
就是这儿呀。昨天正好经过看见了。当时多看了几眼,是因为路边有大把群众在围观,觉得奇怪这有什么好看的。
 
westbound opens with one lane.
 
就是这儿呀。昨天正好经过看见了。当时多看了几眼,是因为路边有大把群众在围观,觉得奇怪这有什么好看的。
这次换的是 417 穿过 kirkwood 的桥。 下周换 417 穿过 carling 的桥
 
通车了:

cfc79_2.PNG
 
Highway 417 closed between Parkdale, Maitland Saturday night

E0B348339E08E4AFC30B260B5F551_h242_w430_m2_q80_cmbNlaCRz1.jpg



A second set of bridge replacements will close Highway 417 in both directions on Saturday and Sunday, a week after the bridge over Kirkwood Avenue was replaced.

The bridges over Carling Avenue are 55 years old and weigh 600 tonnes. It will take less than 24 hours to replace them, according to the province.

More than 100 workers using state-of-the-art technology will replace the bridges overnight.

All lanes of the highway will be closed between the Parkdale and Maitland exits.

Carling Avenue westbound will also be closed between Merivale and the 417.

The rapid bridge replacement technology has been used to replace Highway 417 bridges at Island Park Drive in 2007, Clyde Avenue in 2008, Carling Avenue eastbound in 2011, and last week at Kirkwood Avenue.

People can watch the construction work live from bleachers that will be set up at Food Basics on Carling Avenue.

Construction will begin at about 6 p.m. Saturday and is scheduled to end at about 11 a.m. Sunday.

p-89EKCgBk8MZdE.gif

Read more at msn.com
 
嗯,明天晚上就开工了 :D
 
后退
顶部