Chalk River reactor back running after unplanned shutdown

reine02

资深人士
VIP
注册
2012-02-27
消息
9,438
荣誉分数
2,120
声望点数
273
乔克河核反应堆 恢复运作
2013-11-24 加通社
9205456.jpg

乔克河核反应堆恢复运作
乔克河(Chalk River)老旧的核子反应炉意外关闭后,23日恢复运作。
Chalk River reactor back running after unplanned shutdown
Ontario producer of medical isotopes to resume supply over the weekend
The Canadian Press Posted: Nov 23, 2013 2:23 PM ET Last Updated: Nov 23, 2013 2:23 PM ET

The aging Chalk River nuclear reactor is back up and running after an unplanned shut down.

chalk-river-cp-wrtx4vyi.jpg

The control room at the Atomic Energy Canada Limited (AECL) Chalk River nuclear facility is seen during a media tour in Chalk River, Ont., on Dec. 19, 2007. ((Chris Wattie/Reuters) )

Atomic Energy of Canada Limited says repairs were made to the fuel rod flask — which fuels and de-fuels the reactor.

The Chalk River facility in Ontario is one of the world's largest producers of medical isotopes.

The shutdown took place at a time when two of the world's three other major producers were also out of operation, leading to worries of a possible major shortage of medical isotopes.

AECL said the nuclear facility has begun processing again and will resume supplying medical isotopes over the weekend.

It also said there were no nuclear safety issues around the shut down and the repairs.

© The Canadian Press, 2013

http://www.cbc.ca/news/canada/ottaw...ck-running-after-unplanned-shutdown-1.2437964
 
最后编辑:
这个和那个废弃的反应堆啥关系?
 
后退
顶部