BuyFromUSA
提供美国购物地址并运回Ottawa, 或转运. 电话:613-501-4553
这里有住Stittisville 和 Carp的吗 ? 这个月有个有关Carp Road 拓宽的项目调研, city征询大家的意见,有兴趣的可以参加.
Carp Road Widening Environmental Assessment Study Highway 417 to Hazeldean Road
Open House #2
Date: Wednesday, February 26, 2014
Time: 6:30 to 9 p.m.
Place: Goulbourn Recreation Complex (Arena B Lobby)
Address: 1500 Shea Road, Stittsville
Transit Access: Route # 96
Reference:
http://www.ottawa.ca/carproad
http://ottawa.ca/calendar/ottawa/citycouncil/trc/2012/10-03/05 - ACS2012-PIA-PGM-0228 Carp Road.pdf
The City of Ottawa is undertaking the Carp Road Widening Environmental Assessment Study to
determine the most appropriate means to accommodate and manage increasing transportation
infrastructure requirements in the northwest Stittsville area. The City’s Transportation Master Plan
(TMP 2013) identifies the need for Carp Road widening from two lanes to four lanes between
Highway 417 to Hazeldean Road as a Phase 2 project to be completed between 2020 and 2025.
Consultation
This second Open House will provide an overview of study progress to-date, including the
alternative designs considered and the evaluation criteria and methodology used to determine
preliminary preferred design for the corridor. Your participation in Open House meetings is
important where you can discuss the project with the study team and provide feedback. There
will be on-going public consultation activities during the remaining course of the study.
The EA study is being undertaken in accordance with Ontario’s EA Act, fulfilling requirements as
a Municipal Class EA process for a Schedule ‘C’ project. The EA process will involve developing,
assessing, and evaluating alternatives, which will result in a Recommended Plan which will be
presented to City Council for approval.
Further information on the Carp Road Widening EA Study is available at ottawa.ca/carproad
Interested persons can provide comments throughout the EA process. Any comments received
will be collected under the Environmental Assessment Act and, with the exception of personal
information, will become part of the public record.
Accessibility is an important consideration for the City of Ottawa. If you require special
accommodation, please call 3-1-1 or e-mail the project lead below before the event.
For further information or to provide comments, please contact:
Jabbar Siddique, P. Eng.
Sr. Project Engineer - Environmental Assessment
City of Ottawa
110 Laurier Avenue West
Ottawa, ON K1P1J1
Tel: 613- 580-2424, ext. 13914
Fax: 613- 580-2578
E-mail: Jabbar.Siddique@ottawa.ca
Publication Date: February 13, 2014 Ad # 2013-08-7077-22333 R0012549488-0213
Carp Road Widening Environmental Assessment Study Highway 417 to Hazeldean Road
Open House #2
Date: Wednesday, February 26, 2014
Time: 6:30 to 9 p.m.
Place: Goulbourn Recreation Complex (Arena B Lobby)
Address: 1500 Shea Road, Stittsville
Transit Access: Route # 96
Reference:
http://www.ottawa.ca/carproad
http://ottawa.ca/calendar/ottawa/citycouncil/trc/2012/10-03/05 - ACS2012-PIA-PGM-0228 Carp Road.pdf

The City of Ottawa is undertaking the Carp Road Widening Environmental Assessment Study to
determine the most appropriate means to accommodate and manage increasing transportation
infrastructure requirements in the northwest Stittsville area. The City’s Transportation Master Plan
(TMP 2013) identifies the need for Carp Road widening from two lanes to four lanes between
Highway 417 to Hazeldean Road as a Phase 2 project to be completed between 2020 and 2025.
Consultation
This second Open House will provide an overview of study progress to-date, including the
alternative designs considered and the evaluation criteria and methodology used to determine
preliminary preferred design for the corridor. Your participation in Open House meetings is
important where you can discuss the project with the study team and provide feedback. There
will be on-going public consultation activities during the remaining course of the study.
The EA study is being undertaken in accordance with Ontario’s EA Act, fulfilling requirements as
a Municipal Class EA process for a Schedule ‘C’ project. The EA process will involve developing,
assessing, and evaluating alternatives, which will result in a Recommended Plan which will be
presented to City Council for approval.
Further information on the Carp Road Widening EA Study is available at ottawa.ca/carproad
Interested persons can provide comments throughout the EA process. Any comments received
will be collected under the Environmental Assessment Act and, with the exception of personal
information, will become part of the public record.
Accessibility is an important consideration for the City of Ottawa. If you require special
accommodation, please call 3-1-1 or e-mail the project lead below before the event.
For further information or to provide comments, please contact:
Jabbar Siddique, P. Eng.
Sr. Project Engineer - Environmental Assessment
City of Ottawa
110 Laurier Avenue West
Ottawa, ON K1P1J1
Tel: 613- 580-2424, ext. 13914
Fax: 613- 580-2578
E-mail: Jabbar.Siddique@ottawa.ca
Publication Date: February 13, 2014 Ad # 2013-08-7077-22333 R0012549488-0213