这里有住Stittisville 和 Carp的吗 ? 这个月有个有关Carp Road 拓宽的项目调研, city征询大家的意见,有兴趣的可以参加.

Carp Road Widening Environmental Assessment Study Highway 417 to Hazeldean Road
Open House #2

Date: Wednesday, February 26, 2014
Time: 6:30 to 9 p.m.
Place: Goulbourn Recreation Complex (Arena B Lobby)
Address: 1500 Shea Road, Stittsville
Transit Access: Route # 96

Reference:
http://www.ottawa.ca/carproad

http://ottawa.ca/calendar/ottawa/citycouncil/trc/2012/10-03/05 - ACS2012-PIA-PGM-0228 Carp Road.pdf


carp_widening_study_area.jpg



The City of Ottawa is undertaking the Carp Road Widening Environmental Assessment Study to
determine the most appropriate means to accommodate and manage increasing transportation
infrastructure requirements in the northwest Stittsville area. The City’s Transportation Master Plan
(TMP 2013) identifies the need for Carp Road widening from two lanes to four lanes between
Highway 417 to Hazeldean Road as a Phase 2 project to be completed between 2020 and 2025.
Consultation
This second Open House will provide an overview of study progress to-date, including the
alternative designs considered and the evaluation criteria and methodology used to determine
preliminary preferred design for the corridor. Your participation in Open House meetings is
important where you can discuss the project with the study team and provide feedback. There
will be on-going public consultation activities during the remaining course of the study.
The EA study is being undertaken in accordance with Ontario’s EA Act, fulfilling requirements as
a Municipal Class EA process for a Schedule ‘C’ project. The EA process will involve developing,
assessing, and evaluating alternatives, which will result in a Recommended Plan which will be
presented to City Council for approval.
Further information on the Carp Road Widening EA Study is available at ottawa.ca/carproad
Interested persons can provide comments throughout the EA process. Any comments received
will be collected under the Environmental Assessment Act and, with the exception of personal
information, will become part of the public record.

Accessibility is an important consideration for the City of Ottawa. If you require special
accommodation, please call 3-1-1 or e-mail the project lead below before the event.
For further information or to provide comments, please contact:
Jabbar Siddique, P. Eng.
Sr. Project Engineer - Environmental Assessment
City of Ottawa
110 Laurier Avenue West
Ottawa, ON K1P1J1
Tel: 613- 580-2424, ext. 13914
Fax: 613- 580-2578
E-mail: Jabbar.Siddique@ottawa.ca
Publication Date: February 13, 2014 Ad # 2013-08-7077-22333 R0012549488-0213
 

附件

好嘛呀, 其中一个提议是要在路中间加一排石头墩子 (road Median), 对面的车不能直接转过来.影响生意啊.
road median.jpg

好事儿啊!
 
Good Morning.


Materials for the Carp Road Widening Environmental Assessment Study, to be presented at the 2nd Public Open House (notice attached) tomorrow night at the Goulbourn Recreation Complex, are now available for viewing on the City’s website at the link below.


http://ottawa.ca/en/city-hall/public-consultations/transportation/open-house-2-february-26-2014


This email is being sent on behalf of the project manager for this Study from the City of Ottawa, Jabbar Siddique. Jabbar can be reached at: Jabbar.Siddique@ottawa.ca


“Sent on behalf of the City of Ottawa”


Regards,


Pam Whyte, MCIP, RPP, LEED AP

Senior Planner

Delcan Corporation

1223 Michael Street, Suite 100

Ottawa, ON K1J 7T2

P: 613.738.4160 x 5285

E: p.whyte@delcan.com

P Please consider the environment before printing this email.
 
http://ottawa.ca/en/city-hall/public-consultations/transportation/open-house-3-june-17-2014

Open House #3 - June 17, 2014
Tuesday, June 17, 2014
Holy Spirit Catholic School
1383 Stittsville Main Street
6:30 to 9 p.m.
Transit Access: Route # 96

The City of Ottawa is undertaking the Carp Road Widening Environmental Assessment (EA) Study to determine the most appropriate means to accommodate increasing transportation infrastructure requirements in the northwest Stittsville area of the city. The City's Transportation Master Plan (TMP 2013) identifies the need for the widening of Carp Road from two lanes to four lanes between Highway 417 and Hazeldean Road as a Phase 2 project to be completed between 2020 and 2025.

Consultation
At the second public open house held in February 2014, the Study Team presented a Preliminary Preferred Design for Carp Road that included roundabout intersections, a narrow raised median and a multiuse pathway on both sides of the corridor. Having regard for public input, the Study Team has re-evaluated the alternatives, placing a greater emphasis on providing for adjacent site access and on minimizing property requirements.

This third Open House will provide an overview of the study progress to-date, including a Recommended Plan for the corridor. This Recommended Plan now includes traffic signals at major intersections, a central two-way left-turn lane in some sectors, intermittent medians, and a multi-use pathway along both sides of the corridor. Your participation in Open House meetings is important where you can discuss the project with the study team and provide feedback.

Open House #3 Display Boards
Welcome [ PDF 533 KB ]
Study Area [ PDF 2.4 MB ]
Environmental Assessment Process [ PDF 501 KB ]
Study Schedule [ PDF 422 KB ]
Consultation [ PDF 59 KB ]
Need and Opportunity [ PDF 45 KB ]
Existing Conditions [ PDF 47 KB ]
Existing Conditions – Transportation [ PDF 2.0 MB ]
Existing Conditions – Land Use Designations [ PDF 1.9 MB ]
Preferred Solution [ PDF 37 KB ]
Design Principles [ PDF 28 KB ]
Alternative designs [ PDF 40 KB ]
Suitability of each alternative design [ PDF 80 KB ]
Preliminary Preferred Design [ PDF 45 KB ]
Preferred Design for Carp Road [ PDF 56 KB ]
Recommended mitigation measures [ PDF 49 KB ]
Carp Road Recommended Plan [ PDF 7.1 MB ]
Proposed Edge Of Proposed Right Of Way [ PDF 836 KB ]
Next Steps [ PDF 70 KB ]


The EA Study is being undertaken in accordance with Ontario's EA Act, fulfilling requirements as a Municipal Class EA process for a Schedule 'C' project. The EA process involves developing, assessing, and evaluating alternatives, which result in a Recommended Plan that will be presented to City Council for approval.

Interested persons can provide comments throughout the EA process. Any comments received will be collected under the EA Act and, with the exception of personal information, will become part of the public record.

Accessibility is an important consideration for the City of Ottawa. If you require special accommodation, please e-mail the project lead below before the event.

For further information or to provide comments, please contact:
Jabbar Siddique, P. Eng.
Sr. Project Engineer – Environmental Assessment
City of Ottawa
110 Laurier Avenue West
Ottawa, ON K1P 1J1
Tel: 613-580-2424, ext. 13914
Fax: 613-580-2578
E-mail: Jabbar.Siddique@ottawa.ca
 
From: Stephen Fitzpatrick


“Sent on behalf of the City of Ottawa”



RE: Carp Road Widening Environmental Assessment Study



This email is being sent to you because you have expressed an interest in the Carp Road Widening Environmental Assessment Study or participated in the study process. The City of Ottawa Transportation Committee will review the staff report on this project on Wednesday, September 2nd, 2015 in the Champlain Room of Ottawa City Hall (110 Laurier Avenue West). The meeting is scheduled to begin at 9:30a.m.



A link to the Study Recommendations and associated Staff Report can be found by following the link below, and opening the Carp Road Widening agenda item:


Carp Road Widening EA Study - Transportation Committee Meeting[app05.ottawa.ca]


The Project Manager from the City of Ottawa for this study is Jabbar Siddique who can be reached at: Jabbar.Siddique@ottawa.ca



Thank you,



Steve Fitzpatrick

Associate Environmental Planner
 