Minto Avalon, hydro corridor passing through

baoyou

知名会员
注册
2009-01-03
消息
238
荣誉分数
22
声望点数
128
we are interested in a single model at Avalon with Minto. The lot is close to school and park, but there is a hydro corridor passing by at 45 degree angle. The lot is 50-60 meters away from the corridor. The poles are wooden, not the big iron ones.
I read some articles about the health concern on hydro lines. Appreciate your advice. Thanks!
 
"The poles are wooden"如果是wooden的没啥担心的, 这种线是配线, 任何小区到处都有,
大铁塔有担心是可以理解的。
 
"The poles are wooden"如果是wooden的没啥担心的, 这种线是配线, 任何小区到处都有,
大铁塔有担心是可以理解的。
Thanks for reply! It is not one wooden pole, it is like he following.
 

附件

我们考虑过那里,应该至少是110KV的输电线,我们就放弃了。
 
we are interested in a single model at Avalon with Minto. The lot is close to school and park, but there is a hydro corridor passing by at 45 degree angle. The lot is 50-60 meters away from the corridor. The poles are wooden, not the big iron ones.
I read some articles about the health concern on hydro lines. Appreciate your advice. Thanks!

Read this: http://www.minto.com/Statement-Regarding-Avalon-Settlement-Related-Issues~40.html

Investigate carefully the situation now. This could be a much bigger potential problem than the hydro-lines and poles.

Good luck.
 