http://www.cbc.ca/news/canada/ottawa/rail-grade-separation-costs-ottawa-bus-train-crash-1.4140069
Study came out of TSB recommendation after 2013 fatal bus-train crash
CBC News Posted: May 31, 2017 4:11 PM ET Last Updated: May 31, 2017 4:11 PM ET
A look at six rail crossings in the Ottawa community of Barrhaven. Work to grade separate one crossing, at Greenbank, is almost complete. Now the city is recommending the other five be done as well. (City of Ottawa)
Related Stories
The study was commissioned last year after the Transportation Safety Board recommended the city once again consider the need for such crossings, in the wake of the fatal Barrhaven crash on Sept. 18, 2013.
The study, published Wednesday in advance of next week's meeting of the city's transportation committee, concludes the rail crossings at Woodroffe Avenue, the Transitway, Fallowfield Road, Merivale Road and Jockvale Road should all be grade separated "due to the existing and anticipated increases in road, Transitway and rail traffic."
The cost to revamp all five crossings is estimated at $430 million, meaning the city will need to do the work in phases and will also need help from Via and the federal and provincial governments.
The city looked into grade separation at several level rail crossings more than a decade ago, but high costs, geotechnical issues and other factors led the city to decide against grade separation at those locations.
Overpasses recommended at Woodroffe, Transitway and Fallowfield
Overpasses are now recommended for the Woodroffe, Transitway and Fallowfield locations because of previously identified soil and hydrogeological conditions, while underpasses are recommended for Merivale Road and Jockvale Road.
The three overpasses should be the first projects tackled, followed by Merivale Road and then Jockvale Road, the study said.
But because of the number of pedestrians and cyclists at Jockvale, city staff say a multi-use path underpass for the crossing should be built in the near term.
City staff are recommending the establishment of the Barrhaven Rail Safety Program, which would begin work on environmental assessments for the three potential overpass locations and the multi-use pathway.
Staff are also recommending delegating authority to Mayor Jim Watson to seek funding from the federal and provincial government and VIA Rail for the design and construction phase of the projects.
http://www.cbc.ca/news/canada/ottawa/rail-grade-separation-costs-ottawa-bus-train-crash-1.4140069
Study came out of TSB recommendation after 2013 fatal bus-train crash
CBC News Posted: May 31, 2017 4:11 PM ET Last Updated: May 31, 2017 4:11 PM ET

A look at six rail crossings in the Ottawa community of Barrhaven. Work to grade separate one crossing, at Greenbank, is almost complete. Now the city is recommending the other five be done as well. (City of Ottawa)
Related Stories
- Deadly bus-train crash site could see overpasses or underpasses added
- Ottawa bus-train crash: Events of Sept. 18, 2013
The study was commissioned last year after the Transportation Safety Board recommended the city once again consider the need for such crossings, in the wake of the fatal Barrhaven crash on Sept. 18, 2013.
- Ottawa to study grade separation at site of deadly bus-train crash
- TIMELINE | The Ottawa bus-train crash of September 2013
The study, published Wednesday in advance of next week's meeting of the city's transportation committee, concludes the rail crossings at Woodroffe Avenue, the Transitway, Fallowfield Road, Merivale Road and Jockvale Road should all be grade separated "due to the existing and anticipated increases in road, Transitway and rail traffic."
The cost to revamp all five crossings is estimated at $430 million, meaning the city will need to do the work in phases and will also need help from Via and the federal and provincial governments.
The city looked into grade separation at several level rail crossings more than a decade ago, but high costs, geotechnical issues and other factors led the city to decide against grade separation at those locations.
Overpasses recommended at Woodroffe, Transitway and Fallowfield
Overpasses are now recommended for the Woodroffe, Transitway and Fallowfield locations because of previously identified soil and hydrogeological conditions, while underpasses are recommended for Merivale Road and Jockvale Road.
The three overpasses should be the first projects tackled, followed by Merivale Road and then Jockvale Road, the study said.
But because of the number of pedestrians and cyclists at Jockvale, city staff say a multi-use path underpass for the crossing should be built in the near term.
City staff are recommending the establishment of the Barrhaven Rail Safety Program, which would begin work on environmental assessments for the three potential overpass locations and the multi-use pathway.
Staff are also recommending delegating authority to Mayor Jim Watson to seek funding from the federal and provincial government and VIA Rail for the design and construction phase of the projects.