渥太华冬天骑自行车的可能性

我说了呀
好路骑着走,烂路推着走
比单纯走路快多了
您已经打定主意了,咱也就不多劝了。
记得买份好的人寿保险,对自己也是对家人负责。
 
Fear of winter
If it's so great, then why don't more people do it?

There are practical reasons people don't cycle in the winter: slippery roads, low visibility and snow on streets can force drivers and cyclists to share a narrower space.

But it's difficult to gauge if it's statistically more dangerous. An Ontario coroner's report found that the majority of cycling deaths happen in the spring and summer months — only 9% of cycling deaths happened in January, February and March in the province between 2006 and 2010.

"only 9% of cycling deaths happened in January, February and March in the province between 2006 and 2010."
you know why? because most people are not stupid enough to ride a bicycle in those month
 
如果是没有维护的小径,就cross country ski上班吧。
 
看个人了,我有个同事,一年四季包括冬天骑车上下班,而且貌似他家离公司还不近。
 
结果前几天,他突然开车上班了,成了我们公司的大新闻。。。。
 
渥太华很多自行车道
从2013年开始有很多自行车道冬天也开始维护

养两条大狗吧。再去店里买个爬犁和绳子。冬天就坐狗拉爬犁上学吧。这个也很环保。
 
自行车道除雪是2013年开始的

Winter Cycling Network

Following a recommendation in the 2013 Ottawa Cycling Plan, a network of approximately 40km of cycling facilities will be maintained during this winter season. The Cycling Plan identified several important cycling routes, in addition to those facilities that are already maintained, that form a modest network centered around the downtown core. Cycling facilities will be maintained to the same standard as the neighbouring sidewalk or vehicle travel lanes.

On-street cycling lanes will be plowed following 2.5 to 5.0 cm of accumulation within the timelines identified in the Maintenance Quality Standards (within 24 hours following the completion of snow accumulation). Raised cycle tracks and multi-use pathways will be also be plowed following 2.5 to 5.0 cm of snow accumulation, however they are maintained to a snow packed standard with the exception of those adjacent to arterial roadways. Snow removal will be scheduled when snow banks are encroaching on to 50% of the existing width of the bike lane.
 
玩儿玩,大可一试。实在不行推车回家就是了。

在渥太华的漫长冬季以自行车为日常交通工具那是异想天开。
其实窝村还是有些人冬天骑车出行的。
 
自行车道除雪是2013年开始的

Winter Cycling Network

Following a recommendation in the 2013 Ottawa Cycling Plan, a network of approximately 40km of cycling facilities will be maintained during this winter season. The Cycling Plan identified several important cycling routes, in addition to those facilities that are already maintained, that form a modest network centered around the downtown core. Cycling facilities will be maintained to the same standard as the neighbouring sidewalk or vehicle travel lanes.

On-street cycling lanes will be plowed following 2.5 to 5.0 cm of accumulation within the timelines identified in the Maintenance Quality Standards (within 24 hours following the completion of snow accumulation). Raised cycle tracks and multi-use pathways will be also be plowed following 2.5 to 5.0 cm of snow accumulation, however they are maintained to a snow packed standard with the exception of those adjacent to arterial roadways. Snow removal will be scheduled when snow banks are encroaching on to 50% of the existing width of the bike lane.
骑起!:zhichi::monster::monster::monster:
 
自行车道除雪是2013年开始的

Winter Cycling Network

Following a recommendation in the 2013 Ottawa Cycling Plan, a network of approximately 40km of cycling facilities will be maintained during this winter season. The Cycling Plan identified several important cycling routes, in addition to those facilities that are already maintained, that form a modest network centered around the downtown core. Cycling facilities will be maintained to the same standard as the neighbouring sidewalk or vehicle travel lanes.

On-street cycling lanes will be plowed following 2.5 to 5.0 cm of accumulation within the timelines identified in the Maintenance Quality Standards (within 24 hours following the completion of snow accumulation). Raised cycle tracks and multi-use pathways will be also be plowed following 2.5 to 5.0 cm of snow accumulation, however they are maintained to a snow packed standard with the exception of those adjacent to arterial roadways. Snow removal will be scheduled when snow banks are encroaching on to 50% of the existing width of the bike lane.

啥意思?

On-street cycling lanes will be plowed following 2.5 to 5.0 cm of accumulation within the timelines identified in the Maintenance Quality Standards (within 24 hours following the completion of snow accumulation). Raised cycle tracks and multi-use pathways will be also be plowed following 2.5 to 5.0 cm of snow accumulation, however they are maintained to a snow packed standard with the exception of those adjacent to arterial roadways. Snow removal will be scheduled when snow banks are encroaching on to 50% of the existing width of the bike lane.
 
within 24 hours following the completion of snow accumulation

啥意思?
最多等一天然后你骑车去上班:kan:春长你现在智商堪忧:shale::evil:
 
后退
顶部