Construction along Ogilvie Road in Ottawa is primarily related to upgrading underground infrastructure for communication networks, with some localized projects including potential residential development near Cummings Avenue. The city is working on installing new fibre optic cables to improve its traffic signal and camera systems, which involves digging in the west sidewalk and boulevard area between McArthur Avenue and Ogilvie Road. In another area, construction is planned for a new residential development on Ogilvie Road near Cummings Avenue, which will involve site preparation and new buildings.

Communication network upgrades
  • What: Installation of new fibre optic cables to improve the city's traffic signal and camera system network.
  • Why: To increase communication capacity and efficiency.
  • Where: In the west sidewalk/boulevard between McArthur Avenue and Ogilvie Road.
  • When: Expected to be completed by late October 2025.
  • Traffic impact: Lane reductions and sidewalk closures are expected along the west side of St. Laurent Boulevard, with pedestrians directed to the east side sidewalk.

Residential development near Cummings Avenue
  • What: A new residential complex will be built on the triangle-shaped land between Ogilvie, Cummings, and Cyrville, which will include three high-rises and a hotel.
  • Why: To revitalize the Cyrville area.
  • Where: The site of the former Claude's chip truck at the intersection of Cummings Avenue and Ogilvie Road.
  • When: Site preparation and construction for the development are underway.
 
从现在开始,三级政府大力推基建。窝村预算比往年大幅增长。
问题是,既要保证现有房东利益不受损失。又要年轻人能买的起。如果大面积建房,使房价跌20%以上,还得现有房东出地税,那将会失去这部分人支持。不建,年轻人买不起,负担不了首付。
现在是两头大,中间小。新房免hst有帮助。为了完成目标只能多盖高层筒子楼,但盖好又没人愿意要。
看看怎么既要又要,比较难。为了年轻一代很可能牺牲老一代利益。纽约选市长结果就是活生生例子,社会撕裂
 
如果年轻人不买房,租十年以后将没有任何东西属于自己。租金完全给房东。大多房东靠原始资本积累获利。符合资本主义运作模式,高风险,高回报。但资本如果一毛不拔,结果就是大多年轻一代啥也没有,更容易沦为无家可归者,危害社会安全。加税,如地税,是让资本回馈的一种方式。慈善捐赠是另一个,但新移民似乎没有家庭预算捐赠习惯
 
从现在开始,三级政府大力推基建。窝村预算比往年大幅增长。
问题是,既要保证现有房东利益不受损失。又要年轻人能买的起。如果大面积建房,使房价跌20%以上,还得现有房东出地税,那将会失去这部分人支持。不建,年轻人买不起,负担不了首付。
现在是两头大,中间小。新房免hst有帮助。为了完成目标只能多盖高层筒子楼,但盖好又没人愿意要。
看看怎么既要又要,比较难。为了年轻一代很可能牺牲老一代利益。纽约选市长结果就是活生生例子,社会撕裂
新房免hst的政策基本上是要求上车了的补贴想上车的. 没上车的还可以继续买1000的iphone 和喝星巴克.
 
上周见到一段修路路段插着牌子,结束期应当是10月31日。明显已经超期了。
Construction along Ogilvie Road in Ottawa is primarily related to upgrading underground infrastructure for communication networks, with some localized projects including potential residential development near Cummings Avenue. The city is working on installing new fibre optic cables to improve its traffic signal and camera systems, which involves digging in the west sidewalk and boulevard area between McArthur Avenue and Ogilvie Road. In another area, construction is planned for a new residential development on Ogilvie Road near Cummings Avenue, which will involve site preparation and new buildings.

Communication network upgrades
  • What: Installation of new fibre optic cables to improve the city's traffic signal and camera system network.
  • Why: To increase communication capacity and efficiency.
  • Where: In the west sidewalk/boulevard between McArthur Avenue and Ogilvie Road.
  • When: Expected to be completed by late October 2025.
  • Traffic impact: Lane reductions and sidewalk closures are expected along the west side of St. Laurent Boulevard, with pedestrians directed to the east side sidewalk.

Residential development near Cummings Avenue
  • What: A new residential complex will be built on the triangle-shaped land between Ogilvie, Cummings, and Cyrville, which will include three high-rises and a hotel.
  • Why: To revitalize the Cyrville area.
  • Where: The site of the former Claude's chip truck at the intersection of Cummings Avenue and Ogilvie Road.
  • When: Site preparation and construction for the development are underway.
 