basement安装shower问题

地下室的混凝土不是很厚,大号手锤把表层打掉。下面的小石子正好用来和新混凝土(但要洗一下)
 
use skil saw with diamond blade to cut the slab, no big deal. really dusty
or you can use chipping hammer to smash it, will be messy
or you can rent a quick cut from HD with 14" wet cut blade.
you need drain and vent (a.k.a. DWV), there are requirements/code regarding that. the plumber's advice makes sense.
 
use skil saw with diamond blade to cut the slab, no big deal. really dusty
or you can use chipping hammer to smash it, will be messy
or you can rent a quick cut from HD with 14" wet cut blade.
you need drain and vent (a.k.a. DWV), there are requirements/code regarding that. the plumber's advice makes sense.

最早,觉得你是个热心肠,乐于助人的人,可越看你的帖越觉得你像干这行的。我宁愿相信你是个热心肠的人,所以我就啰嗦两句。希望你给别人做参谋的时候,懂就说,不确定就别说或用些“可能”“也许”之类的词,别好心却没干成好事。

就说这个帖,前面说得都挺好,最后一条就不沾边了。你懂不懂为什么下水系统要有排气孔?如果没有排气管的话会产生什么样的后果?如果没闹明白,就别comment,看看连Licensed水管工都在说“if ... too far ... ”这样的话忽悠,您是不是胆也太大点了,还抬出什么code,懂行的人说这样的话是不是太不厚道了。LZ是把2 pieces upgrade 到 3 Pieces,巴掌大的地方接个下水只管,还要接vent,你以为别人都是傻冒,那么好忽悠!
 
后退
顶部