- 注册
- 2002-10-07
- 消息
- 402,583
- 荣誉分数
- 76
- 声望点数
- 228
Three third-party reviews, two major delays and one unfinished bridge. That’s the story so far of the Airport Parkway pedestrian bridge, the much-delayed construction of which was indefinitely suspended last Friday due to a dispute over the long-term sustainability of the structure’s design.
查看原文...
查看原文...