Tunnelling still on hold at LRT east portal because of collapse

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,608
荣誉分数
76
声望点数
228
Tunnelling operations at the eastern end of the light-rail transit tunnel near the University of Ottawa are still on hold, days after a large sinkhole opened up on Waller Street.

查看原文...
 
后退
顶部
首页 论坛
消息
我的