Upcoming ramp closures and lane reductions on Highways 417 and 174

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,640
荣誉分数
77
声望点数
228




Ottawa – Starting Friday, August 22, Hwy 417 will be reduced to two lanes in each direction between Nicholas Street and the Hwy 417/174 split from Friday evening at 9 p.m. until Monday morning at 6 a.m.

Starting Monday, August 25 until Saturday, August 30 there will be occasional off-peak lane reductions on Hwy 417 in both directions between Nicholas Street and the Hwy 417/174 split and in the eastbound direction between Lyon Street and Elgin Street. Hwy 174 westbound will also be subject to off-peak lane reductions between Montreal Road and Blair Road.

In addition, Hwy 417 will be closed in both directions between Lees Avenue and the Hwy 417/174 split at 15-minute intervals between 1 a.m. and 4 a.m. starting Monday, August 25 until Saturday, August 30. During these periods, Ontario Provincial Police will be on hand to direct traffic; however, motorists are urged to consider alternate routes.

In addition to the above lane restrictions, the following ramp closures will occur:

  • The northbound St. Laurent Boulevard on-ramp to Hwy 417 westbound will remain closed until Friday, September 12. Please follow the signed detour route on Coventry Road.
  • This southbound St. Laurent Boulevard on-ramp to Hwy 417 westbound will be closed nightly from Sunday, August 24 until Saturday, August 30.
  • The southbound St. Laurent Boulevard on-ramp to Hwy 417 eastbound is closed nightly from Sunday, August 24 until Saturday, August 30.
  • The eastbound and westbound Hwy 417 off-ramps to the Vanier Parkway will be closed nightly from Sunday, August 24 until Saturday, August 30. Please note that the eastbound Vanier Parkway off-ramp will not be closed simultaneously with the eastbound St. Laurent Boulevard off-ramp.
  • The northbound Vanier Parkway on-ramp to Hwy 417 eastbound will be closed nightly from Sunday, August 24 until Saturday, August 30.
  • The southbound Vanier Parkway on-ramp to Hwy 417 eastbound will be closed nightly from Sunday, August 24 until Saturday, August 30.
  • The southbound Vanier Parkway on-ramp to Hwy 417 westbound will be closed nightly from Sunday, August 24 until Saturday, August 30.
  • The eastbound Hwy 417 off-ramp to St. Laurent Boulevard will be closed nightly from Sunday, August 24 until Saturday August 30. Please note this ramp will not be closed simultaneously with the eastbound Hwy 417 off-ramp to Vanier Parkway.

Signage will be in place to advise drivers of these traffic and road changes. Motorists are also reminded to respect the reduced speed limits and use caution when travelling through construction zones. Many of these construction elements are weather-dependant and may be implemented later than the dates given above.

This work is being done as part of the Hwy 417 expansion project, which began in May 2013, and will add an additional lane in each direction between Nicholas Street and the Split. The additional lane will be used for bus rapid transit during the 2015 to 2018 phase of the Confederation Line construction.

With all of the construction-related activities underway, residents are encouraged to be flexible with commuting times, stagger work hours or use other alternative means for travel. The public is asked to consider options such as transit, walking, cycling or carpooling.

The City of Ottawa has tools on ottawa.ca to help motorists and transit users plan their routes and manage their commute including:


Further details and other information concerning City road works are available on ottawa.ca.

-30-​

查看原文...
 
后退
顶部
首页 论坛
消息
我的