Airport Parkway pedestrian bridge opens after several delays

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,591
荣誉分数
76
声望点数
228
airport-parkway-pedestrian-bridge-opens.jpg

Ottawa’s long-awaited Airport Parkway pedestrian bridge officially opened to the public on Saturday after several hiccups and delays.

查看原文...
 
后退
顶部
首页 论坛
消息
我的