- 注册
- 2002-10-07
- 消息
- 402,238
- 荣誉分数
- 76
- 声望点数
- 0
Ottawa – On Wednesday, July 13 and Thursday, July 14, a westbound lane on St. Joseph Boulevard between St. Pierre Street and Maisonneuve Street will be closed to accommodate drilling of three boreholes to investigate soil conditions in preparation for watermain replacement. One westbound lane will remain open at all times.
The work will be carried out between 7 a.m. and 5 p.m. both days. Flagpersons will direct westbound traffic to the open lane.
For more information about the construction activity happening across the city, or for information about traffic and travel planning, visit ottawa.ca.
For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-9656). You can also connect with us through Facebook, Twitter and Instagram.
查看原文...
The work will be carried out between 7 a.m. and 5 p.m. both days. Flagpersons will direct westbound traffic to the open lane.
For more information about the construction activity happening across the city, or for information about traffic and travel planning, visit ottawa.ca.
For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-9656). You can also connect with us through Facebook, Twitter and Instagram.
-30-
查看原文...