Section of Stagecoach Road closed for construction starting Monday

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,333
荣誉分数
76
声望点数
0
Ottawa – As of Monday, September 12, Stagecoach Road near Snake Island Road will be closed to motorists, cyclists and pedestrians until early November. This closure is required while the City of Ottawa replaces a bridge culvert.


Replacement of the Stagecoach Road bridge culvert, located approximately 250 metres south of Snake Island Road, will require the full closure of a section of Stagecoach Road. Traffic will be detoured via Blanchfield Road around the work area. Signage will be in place to notify the public of the temporary closure.


For current information about traffic and construction around the city, visit ottawa.ca.


For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.

-30-​

查看原文...
 
后退
顶部