The step 1 is OK,
Step 2: You don't need to make a hole on the pipe. You can un-screw out the screws around a joint of a the pipe, and separate the pipes at the joint. I think it would be easier to direct the cable from upper floor to basement to take the advantage of gravity. After it's done, put back the pipes and screw them up.