Update: Traffic impacts in Ottawa beginning Friday, October 30

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,179
荣誉分数
76
声望点数
0
October 30, 2020 – The following projects will impact Ottawa traffic:

  • Highway 417 – The following Highway 417 off-ramps will be closed for paving:
  • Eastbund off-ramps at Nicholas Street and Lees Avenue will close at 10 pm on Thursday, October 29 and Friday, October 30, reopening at 6 am the following morning.
  • The westbund off-ramp at Nicholas Street will close at 10 pm each night from Sunday, November 1 through Friday, November 6, reopening at 6 am the following morning.
  • The westbund on-ramp from southbound Pinecrest Road will be closed nightly from 10 pm to 5 am for up to two weeks starting October 31.
  • Highway 174
    • The eastbund off-ramp and on-ramp from westbound Montreal Road will be closed from 10 pm on Friday, October 30 to 5 am on Monday, November 2.
  • The eastbund on-ramp from eastbound Montreal Road will also be closed (overnight only).
  • Prince of Wales Drive will be reduced intermittently in both directions on weekdays between Danbury Way and Carsonby Road from Wednesday, October 28 until Monday, November 30 for guiderail replacement. Local access will be maintained, and traffic controllers will be on site to direct motorists, pedestrians and cyclists.
  • Vanier Parkway southbound will be reduced to one lane between Queen Mary Street and Presland Road from Friday, October 30 until Sunday, November 1 for watermain and curb work. Pedestrian detours will be in place on the west sidewalk.
  • Rockhurst Road will close between Scott and Gould streets from Monday, November 2 until Friday, November 6 for sewer and watermain replacement. Local, pedestrian and cycling access will be maintained and a signed detour will be in place.
  • Albion Road will close between Mitch Owens and Rideau roads from Friday, October 30 at 6 pm until Sunday, November 1 at 6 am for culvert replacements. A signed detour will be in place.
  • The eastbound lane and adjacent bike lane on Scott Street approaching Parkdale Avenue will be closed daily from 9 am until 3 pm between Monday, November 2 and the end of November. Cyclists and transit can use vehicle traffic lanes and bus routes will not be affected. The intersection’s southwest sidewalks will also close and detour signage will be in place.
  • Mackenzie Avenue will close intermittently between St. Patrick and Rideau streets on Saturday, October 31 from 5:30 pm until 11 pm, for no more than five minutes at a time.
  • Bantree Street will be reduced intermittently in both directions west of Blackwell Street from Monday, November 2 until Wednesday, November 4 for guiderail replacement.
  • River Road will be reduced intermittently in both directions south of Nixon Road from Wednesday, November 4 until Friday, November 6 for guiderail replacement.

For updates on construction and roadwork activity across Ottawa, or for information about traffic and travel planning, visit the City’s traffic map or follow the City’s traffic account on Twitter.

For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.

查看原文...
 
后退
顶部