- 注册
- 2002-10-07
- 消息
- 402,179
- 荣誉分数
- 76
- 声望点数
- 0
The on-ramp from Moodie Drive northbound to Highway 417 westbound will close for Stage 2 LRT work starting early morning on Monday, April 1. It will remain closed until December. Signed detours will be in place through the duration of construction. Cycling and pedestrian routes will remain open.
The following detour will be in effect during the closure:
Detour for the closure of the on-ramp from Moodie Drive northbound to Highway 417 westbound
From Moodie Drive north of Hwy 417
Details for each closure and the detours in place will be provided before the work begins. The Stage 2 O-Train West extension will run in a trench on the north side of the highway, travelling underneath Pinecrest and Moodie.
查看原文...
The following detour will be in effect during the closure:
Detour for the closure of the on-ramp from Moodie Drive northbound to Highway 417 westbound
From Moodie Drive north of Hwy 417
- Turn left on Carling Avenue
- Turn left on March Road
- Enter Hwy 417 at March Road on-ramp
Details for each closure and the detours in place will be provided before the work begins. The Stage 2 O-Train West extension will run in a trench on the north side of the highway, travelling underneath Pinecrest and Moodie.
查看原文...