- 注册
- 2002-10-07
- 消息
- 402,179
- 荣誉分数
- 76
- 声望点数
- 0
The following projects will impact Ottawa traffic:
For updates on construction and roadwork activity across Ottawa, or for information about traffic and travel planning, visit the City’s traffic map or follow the City’s traffic account on Twitter.
For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.
查看原文...
- Highway 174 – The following Highway 174 ramps and lanes will close for Stage 2 LRT roadwork:
- The Highway 174 eastbound lanes will close nightly between Tenth Line Road and Trim Road from 8 pm to 6 am from Tuesday, July 6 to Thursday, July 8.
- The eastbound on-ramp from Place d’Orléans Drive will close nightly from 8 pm to 6 am from Tuesday, July 6 to Thursday, July 8.
- Redwood Avenue will close from Richmond Road to Byron Avenue until the evening of Wednesday, July 7.
- Hunt Club Road will be reduced to one eastbound lane between Airport Parkway and Mac Street from 7 pm to 6 am on Monday, July 5 and Thursday, July 8 for Stage 2 LRT work.
- Montreal Road will be reduced to one lane of traffic per direction under the Highway 174 overpass until mid-July for Stage 2 LRT work. The road will close nightly from 6 pm to 6 am starting Monday, July 5 to Saturday, July 10 and again from Monday, July 12 to Thursday, July 15. Access ramps to and from the highway will remain open.
- Orangeville Street will close between Rochester and Lebreton streets from Monday, July 5 to November 2025 for the construction of the Province of Ontario’s midtown rapid bridge lift replacement project.
- Raymond Street will close between Booth and Rochester streets from Monday, July 5 to October 2022 for the construction of the Province of Ontario’s midtown rapid bridge lift replacement project.
- Bankfield Road will have intermittent daytime lane reductions in both directions and nighttime lane closures, east of First Line Road to Rideau Valley Drive, beginning Sunday, July 4 until late July for road rehabilitation work. Personnel will be on site to direct traffic. Local access, as well as pedestrian and cyclist traffic will be maintained.
- The Flora Footbridge, connecting Queen Elizabeth Drive and Colonel By Drive over the Rideau Canal, will close between 6 pm and 11 pm on Wednesday, July 7 for warranty work. Pedestrians and cyclists will be detoured to use either the Pretoria Bridge or Bank Street during this time. Signage will be in place. In the event of a rain delay, this work will be rescheduled to Thursday, July 8.
For updates on construction and roadwork activity across Ottawa, or for information about traffic and travel planning, visit the City’s traffic map or follow the City’s traffic account on Twitter.
For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.
查看原文...