Traffic impacts in Ottawa beginning Friday, August 27

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,179
荣誉分数
76
声望点数
0
The following projects will impact Ottawa traffic:

  • Bank Street will close between Mitch Owens and Parkway roads from 5 am on Saturday, August 28 to 6 am on Monday, August 30 for the installation of a storm sewer. A signed detour for motorists, pedestrians and cyclists will be in place. Local access will be maintained.
  • The following Highway 174 ramps and lanes will be closed for Stage 2 LRT work:
    • The eastbound on-ramp from Place d’Orléans Drive is closed until 5:30 am on Friday, September 3.
    • The eastbound off-ramp to Tenth Line Road is closed until 5:30 am on Friday, September 3.
    • The eastbound on-ramp from northbound Montreal Road will close from 9 pm on Friday, August 27 to Tuesday, August 31 at 5:30 am.
    • The westbound on-ramps from northbound and southbound Montreal Road are closed nightly between 9 pm and 5:30 am until Saturday August 28, and will close again nightly from Monday, August 30 to Saturday, September 4.
    • Highway 174 eastbound will be reduced to one lane between Champlain Street and Tenth Line Road from 9 pm on Friday, August 27 until Monday, August 30 at 3 pm.
  • Ramsayville Road will close at Highway 417 from Friday August 27 at 8 pm to Monday, August 30 at 6 am. A signed detour will be in place.

For updates on construction and roadwork activity across Ottawa, or for information about traffic and travel planning, visit the City’s traffic map or follow the City’s traffic account on Twitter.

For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.

查看原文...
 
后退
顶部