- 注册
- 2002-10-07
- 消息
- 402,179
- 荣誉分数
- 76
- 声望点数
- 0
Hunt Club Road will be reduced to one lane in each direction between the Airport Parkway and Daze Street starting the morning of November 3 until the end of January 2022 for Stage 2 LRT construction of the Hunt Club rail-over-road bridge. To safely accommodate construction activities, the following Airport Parkway ramps will be closed throughout the lane reductions:
Motorists are encouraged to use alternate routes. Signage will be in place to advise pedestrians and cyclists of routes through the work zone.
The Stage 2 O-Train South extension will extend the existing line from Greenboro Station to Limebank Road, and will link to the Ottawa Macdonald-Cartier International Airport.
查看原文...
- The southbound off-ramp to eastbound Hunt Club Road
- The northbound on-ramp from eastbound Hunt Club Road
- The northbound off-ramp to westbound Hunt Club Road
Motorists are encouraged to use alternate routes. Signage will be in place to advise pedestrians and cyclists of routes through the work zone.
The Stage 2 O-Train South extension will extend the existing line from Greenboro Station to Limebank Road, and will link to the Ottawa Macdonald-Cartier International Airport.
查看原文...