billwanhua
本站元老
- 注册
- 2005-07-07
- 消息
- 15,186
- 荣誉分数
- 4,723
- 声望点数
- 373
Ford blasts cost to 'build a damn tunnel' in Ontario
The premier is determined to build a tunnelled expressway under the 401, but expressed frustration over the potential cost
www.villagereport.ca
Premier Doug Ford said his government is going to "drill down" on the costs of building tunnelled construction projects in Ontario after some estimates have pegged the cost of his buried expressway plans at over $100 billion.
Ford announced last week he's ordered a feasibility study of building a buried expressway and transit line under Highway 401, from Brampton to Scarborough.
At a press conference Wednesday, he weighed in on a potential cost estimate for the project published by the Globe and Mail. Tunnelling engineers pegged the project at potentially $1-billion per kilometre for a four-lane tunnel — two lanes in each direction — but twice or three times that if additional lanes, or transit, would be included.
4车道(单向俩车道)每公里10亿,加车道就增加2-3倍,1000亿修4车道,关键修了单向两车道的路根本不能解决交通问题吧!
Asked if he is worried about adding that much to the provincial debt, the premier replied that rating agencies have favoured the province because it's not "squandering" money.
He also complained about the potential cost of the tunnelled highway.
"Why are we the most expensive in the world to build a damn tunnel?" he said and referred to a chart he has on his phone that compares tunnelling costs. "Why can Spain do it 1/5 the cost, and all the countries that are that are listed the fraction of the cost? Why is it so expensive? So we have to sit down and drill down. They have to explain."
福胖还大大表扬了安省,可以负债,因为债务评级机构给了安省很高评分。
然后发飙说为什么安省修路这么贵,是西班牙的5倍,(可能是土鳖20倍吧).
人均GDP 高的害处,一样的东西,10倍的价格,是不是跟人均GDP低的地方一样的生活水平?