O-Train Line 1 service adjustment on December 1 for Stage 2 testing

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,292
荣誉分数
76
声望点数
0
Upcoming O-Train Line 1 service adjustment on December 1

O-Train Line 1 service will not run between Tunney’s Pasture and Blair stations on Sunday, December 1 from 8 am to 12:30 pm. Full Line 1 service will resume at 12:30 pm.

During the temporary closure, R1 replacement bus service will run from 8 am to 1 pm between Tunney’s Pasture and Blair stations. In addition to R1, shuttle bus service will run between St-Laurent and Cyrville stations, and between Lees Station and Mackenzie King Bridge, until 1 pm.

This service adjustment is required for testing of Stage 2 software integration for the train control system, including the high-speed data radio, camera, and passenger information systems. This testing is a key step towards the launch of the expanded O-Train network.

For updates and trip planning assistance, visit octranspo.com or call 613-560-5000. You can also connect with OC Transpo on Facebook, X (formerly Twitter), and Instagram.

For more information on City programs and services, visit ottawa.ca, call 3-1-1 (TTY: 613-580-2401) or 613-580-2400 to contact the City using Canada Video Relay Service. You can also connect with us through Facebook, X (formerly Twitter) and Instagram.

查看原文...
 
后退
顶部