O-Train Line 1 service adjustment on December 14 for Stage 2 testing

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,224
荣誉分数
76
声望点数
0
Upcoming O-Train Line 1 service adjustment on December 14

O-Train Line 1 service will not run between Tunney’s Pasture and Blair stations all day on Saturday, December 14. Line 1 service will resume at approximately 8 am, for the start of the service day on Sunday, December 15.

During the temporary closure, R1 replacement bus service will operate between Tunney’s Pasture and Blair Stations from 6 am to 2 am. In addition to R1, shuttle bus service will run between St-Laurent and Cyrville stations, and between Lees Station and Mackenzie King Bridge.

This temporary closure is required for system integration testing of train control software, in preparation for the Stage 2 O-Train East extension.

For updates and trip planning assistance, visit octranspo.com or call 613-560-5000. You can also connect with OC Transpo on Facebook, X (formerly Twitter), and Instagram.

For more information on City programs and services, visit ottawa.ca, call 3-1-1 (TTY: 613-580-2401) or 613-580-2400 to contact the City using Canada Video Relay Service. You can also connect with us through Facebook, X (formerly Twitter) and Instagram.

查看原文...
 
后退
顶部