==

1) a little is ok in garbage. a lot you have to call a company to remove it.
2) There are steel spikes in HD. one end drove to the ground, one end for wood poles,
 
我猜你可能要做一个稍微大一点的,比如4X6。我认为这种框架结构已经很稳定了,把木桩埋很深的意义不大,这跟Fence不同。所以,如果是我做,埋下4,5寸就可以了。
 
谢谢Tim。五六块吧,下次收垃圾我放边道试试,主要是挺沉的我怕不收还得搬回来。
你说的Spike也得有力气才能拧进土里去吧?不知没有什么电动工具可以租借挖坑。我的想法是挖个坑,然后垫碎石,然后上木桩,然后填一半碎石,然后填soil。你说的Spike直接扎到土里边,不知道行不行。我去HD看看,再谢!

one or two piece a time, in the garbage can or in the bag. They wouldn't take it if you just put on side. They shouldn't take them. You have to doing something....
 
后退
顶部
首页 论坛
消息
我的