Summer rains wash out next year’s Wakefield steam train runs

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,291
荣誉分数
76
声望点数
0
The Wakefield Steam Train is unlikely to operate in 2012 after torrential rains this summer wiped out a section of the rail line near Chelsea. On Tuesday, a preliminary estimate was released putting the cost of repairing the damaged rail line at $7 million.

更多...
 
后退
顶部