Overnight closures of uOttawa pedestrian and cycling underpass

  • 主题发起人 主题发起人 guest
  • 开始时间 开始时间

guest

Moderator
管理成员
注册
2002-10-07
消息
402,581
荣誉分数
76
声望点数
228
Ottawa – Overnight closures are planned in October for the pedestrian and cycling tunnel that passes under Nicholas Street and the Transitway, between uOttawa and Colonel By Drive.


The first closure will begin Friday, October 14. Closures will then take place every night, from Monday, October 24 through Friday, October 28. All closures will begin at 6 p.m. and will be in place until 6 a.m. the following morning. The tunnel will be closed completely during these times.


The closures are needed to accommodate work related to construction of uOttawa Station, part of the O-Train Confederation Line light rail transit system.


Wayfinding signs and detour maps are being installed in advance on the approaches to the tunnel, on the uOttawa campus, at the Corkstown and Adàwe Bridges, and on Elgin and Somerset streets to guide all users to the alternate routes to their destinations. During these closures, pedestrians and cyclists are encouraged to use the Colonel By Drive pathway and Laurier Avenue (see attached map).


This work is part of the O-Train Confederation Line light rail transit project, and Ottawa on the Move. Ottawa on the Move is about keeping our community and economy moving forward through strategic investments in a number of transportation, water, and sewer projects to build a better city and create jobs.


For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.

-30-​

查看原文...
 
后退
顶部
首页 论坛
消息
我的