problem3
a.
total overhead=2,400,000
POHR=6
Actural Hours=40,000
Applied OH=2,442,000
Actural OH=2,431,000
Over applied=11,000
b.
1105:19.44X48000=933,120
1106:13.3X39000=518,700
1201:12.1X29500=356,950
1203:4.3X49,000=210,700
c.
1105:213840
1202:544000
1106:250000
1203:94600
b/n:70000
1201:60500
con:130,000
overapplied overhead:
w/p:1320
f/g:1650
cogs:8030