今天晴转阴,偶尔有毛毛雨。EHS的碎石设备9:30AM到场,2:30PM离开。其主要作用是击碎大块石头,但由于臂长有限,其功效受到限制。初步测量后发现有些洞最深处已达3尺,但直径只有10cm,即碎石钢杵的直径。下一步是要将洞扩大到埋桩的程度。
一个值得注意的问题是:其实地下并没有大岩石,刨出的石头都只有成人拳头大小,而且也不是所有的洞都有石头。碎石设备留下的痕迹中也没有发现大岩石的存在。既然只是碎石,为什么会这么费劲?
阿土的容忍深度是3尺,Ontario building code 的底线。
关于深度我email询问了city,得到答复是没有相关规定,但我觉得保险起见如果下面是石头的,还是尽量应该让他们挖到3尺。
Thank you for contacting the City of Ottawa. With regard to your inquiry, as per our City plans examiners, there are no regulations associated with fence posts.
Yours truly,
XXXXX
Client Services/Service à la clientèle
3-1-1 or/ou 613-580-2400
www.ottawa.ca
In order to comply with the Municipal Freedom of information and Protection of Privacy Act (MFIPPA) regulations, we would like to bring to your attention the following MFIPPA notification. Please click on the following link to view this notification: http://ottawa.ca/contactus/notification_en.html
Conformément aux dispositions de la Loi sur l'accès l'information municipale et la protection de la vie prive (LAIMPVP), nous aimerions attirer votre attention sur un avis extrait de la LAIMPVP. Cliquez sur le lien suivant pour lire cet avis : http://app01.ottawa.ca/contactus/notification_fr.html.
EHS的 site manager 在洞深不够的情况下,无视双方“由房主签字认可洞深”的书面协议,擅自将水泥灌入大约20个洞中,造成既成事实的结果。此举立刻产生重大纠纷,至少涉及4个家庭。
目前两位组织者正在积极调解,寻找解决方案。希望可以尽快妥善解决,但前景不太乐观。
I asked a home inspector about fence post depth and related building codes and regulations. He said that fences are not covered in the Building Codes and he is not aware of any regulations. He suggested that I contact the City to see if there's any by-laws. But based on Cobalt's post, the City doesn't seem to regulate fence posts either.
Perhaps the 3-foot limit is simply an industry practice and not a code requirement.
I'm not a home inspector nor am I familiar with building codes, but I would suggest that you look into that more...
On the other hand, if there is a written agreement between you and EHS in that the depth of the holes need to be inspected by the home owners before EHS is allowed to pour concrete, then what they did yesterday violated a contractual obligation. But even that, negotiation should still precede agrument.
对于已经灌注水泥的洞,不够3尺的必须重挖。1尺=12寸而非10寸,3尺=36寸,如同我们书面约定的那样,得到确认后才可灌水泥。不是说了星期一两个owner都会在场监工,我们也会尽量到场一起帮你解决嘛?
但你得给我们个底线,已经有水泥的洞,2尺8寸你是不是肯定接受不了,一定要他们推掉重挖?
最早我就试图和EHS确定打桩时间,请假在家陪着他们,有电邮为证。但他们很聪明,就是不说什么时候做我家的,而且拖了20多天,搞得我请的假都白费了。关于工人不遵守规定的问题我们也会再次给他们警告,公司监管制度实在让人操心,在这些行业要找一个100%靠谱的太难了。