联邦政府资助10亿给渥太华的轻轨第二期

  • 主题发起人 主题发起人 Riven
  • 开始时间 开始时间

Riven

Administrator
管理成员
注册
2002-01-16
消息
28,415
荣誉分数
5,416
声望点数
393
http://www.cbc.ca/news/canada/ottaw...-for-light-rail-expansion-in-ottawa-1.3164081



This Stage 2 LRT package will:
  • Expand the O-Train system, the City's overall Light Rail Transit (LRT) network farther to the east, west and the south and specifically:
    • West to Bayshore Station (Confederation Line West Extension) and southwest to Baseline Station
    • East to Place d'Orléans Station (Confederation Line East Extension)
    • South to Riverside South at Bowesville (Trillium Line Extension)
  • Build on the current Trillium Line and the future Confederation Line - the backbone of the City's O-Train system – which is currently under construction and anticipated to open in 2018.
  • Bring close to 70 per cent of the City's population within five kilometres of rail transit by 2023 –nearly doubling the amount of residents who will be within five kilometres of rail.
  • Add 30 kilometres of new rail and 19 new stations to Ottawa's transit system.
  • Reduce travel times, improve productivity, and contain transportation costs. By attracting new riders, and becoming the first transportation choice for many during peak and off peak hours, this plan is key to helping the City reach its targets for increasing the use of sustainable transportation options like transit.
  • Link communities and connect residents to destinations across the City, including our major post-secondary institutions, retail centres (major malls including Bayshore, Rideau Centre, St. Laurent, Place d'Orléans, South Keys), employment nodes, as well as a broad range of recreational and cultural opportunities including parks, the Canal, museums and various other institutions.
upload_2015-7-23_15-9-52.png
 
最后编辑:
第一期2018年完工
 
第一期从哪儿到哪儿呀?
 
30亿预算,三级政府平摊,联邦的10亿给了,省里的10亿呢?
 
哪一期能到八村啊.

当年那个光头市长害人啊 ...
 
跟儿童牛奶金一样,这是保守党送给渥太华居民的大礼
 
哪一期能到八村啊.

当年那个光头市长害人啊 ...
upload_2015-7-23_15-10-25.png


看这个图,第二期没有把村和坎屯啥事。可能要第三期才会到。等2030年吧。
 
那一期能到kanata?
 
http://www.cbc.ca/news/canada/ottaw...-for-light-rail-expansion-in-ottawa-1.3164081



This Stage 2 LRT package will:
  • Expand the O-Train system, the City's overall Light Rail Transit (LRT) network farther to the east, west and the south and specifically:
    • West to Bayshore Station (Confederation Line West Extension) and southwest to Baseline Station
    • East to Place d'Orléans Station (Confederation Line East Extension)
    • South to Riverside South at Bowesville (Trillium Line Extension)
  • Build on the current Trillium Line and the future Confederation Line - the backbone of the City's O-Train system – which is currently under construction and anticipated to open in 2018.
  • Bring close to 70 per cent of the City's population within five kilometres of rail transit by 2023 –nearly doubling the amount of residents who will be within five kilometres of rail.
  • Add 30 kilometres of new rail and 19 new stations to Ottawa's transit system.
  • Reduce travel times, improve productivity, and contain transportation costs. By attracting new riders, and becoming the first transportation choice for many during peak and off peak hours, this plan is key to helping the City reach its targets for increasing the use of sustainable transportation options like transit.
  • Link communities and connect residents to destinations across the City, including our major post-secondary institutions, retail centres (major malls including Bayshore, Rideau Centre, St. Laurent, Place d'Orléans, South Keys), employment nodes, as well as a broad range of recreational and cultural opportunities including parks, the Canal, museums and various other institutions.
浏览附件529378

这二期工程猴年马月完工?
 
后退
顶部